Sign In | Join Free | My qualitytoyschina.com |
|
Brand Name : ShiTan
Model Number : ST-350
Certification : ISO,CE,SGS,TUV,BV
Place of Origin : China
MOQ : 1 set
Price : workable
Payment Terms : T/T, Western Union
Supply Ability : 2000 sets per year
Delivery Time : 10-15 days
Packaging Details : customized packed or normal packing
Place Of Origin : China (Mainland)
Model Numbe(m) : ST-350
Drilling Depths : 350 meters
Hole Diameters : 105-350mm
Warranty : 1 year
Color : Yellow,Red
OEM : Customized
Crawler : Steel Crawler
Truck Mounted : Optional
ST 350 Meters Depth Drilling Machine 92kw Diesel Engine Crawler Chassis Mounted Drilling Rig
ST 350 Crawler Chassis Mounted Drilling Rig Descrption
ST 350 Pneumatic Drilling Rig Machine is is equipped with powerful hydraulic rock drills that offer high penetration rates, reliability, and excellent fuel economy. These diesel-powered rigs represent the industry's leading range, from lightweight rubber-tire drills to the most powerful production drills available.
ST 350 Crawler Chassis Mounted Drilling Rig Technical Information
Model | ST 350 Pneumatic Drilling Rig Machine |
Drilling depth | 350m |
Dia.hole | φ140 - 325mm |
Advance Length one time | 6.6m |
Working pressure | 1.7-3.3MPa |
Air consumption | 17-35m³/min |
Length of rod | 1.5m,2m,3m, 6m |
Dia. Of rod | φ89,φ102,φ114 |
Lifting power | 24T |
Rotation torque | 6200-85000N.m |
Rotation Speed | 55-115r/min |
Diesel Engine | Yuchai |
Engine Power | 92Kw/2200rpm |
Travelling speed | 0-2.5 Km/h |
Climb capacity | 30° |
Weight | 9000kgs |
Dimension | 5900x2000x2850mm |
Application | Complicated geological conditions: Rock, Mud, Sand etc. |
ST 350 Crawler Chassis Mounted Drilling Rig Working Attentions
When shipping the water well drilling rig, safety inspection shall be carried out. All parts of the drilling rig shall be complete, and the cable shall be free of electric leakage, drill pipe and drilling tool. When entering the construction site, the rig tower shall be fixed, the area of the drilling site shall be larger than the rig base, and there shall be enough safety space around.
The drilling rig for water wells shall be constructed in strict accordance with the hole position, orientation, angle and hole depth, and the driller shall not change it without authorization. When installing the drill pipe, check the water well drilling rig to ensure that the drill pipe is not blocked, bent and the screw mouth is not worn. Unqualified drill pipes are strictly prohibited.
![]() |
ST 350 Meters Depth 92kw Diesel Engine OEM Crawler Mounted Drill Rig Images |